FacebooklinkedininstagramFacebooklinkedininstagram

Eastman East Lake Road Drainage

 

Grantham, New Hampshire

The Eastman Community Association (ECA) selected DuBois & King to assess existing conditions (including stormwater patterns, drainage infrastructure, erosion areas, roadway conditions and subsurface conditions) to evaluate stormwater quality, erosion and roadway improvements to mitigate water quality impact to Eastman Lake. Located within the sub-association of the Eastlake Condominium Association (ELCA), DuBois & King collaborated with both stakeholders on developing improvement alternatives. The engineering study discussed roadway surface, stormwater collection and stormwater treatment options enhance water quality discharging to the lake. An engineering study recommending the preferred alternative, project phasing and anticipated construction costs has been approved by the ECA and ELCA project committee. A Public Hearing is scheduled to receive public feedback that will ultimately lead to the design/development phase of the project.

Construction of the recommended improvements are scheduled to be completed Summer 2017. DuBois & King staff are providing hydraulic and hydrologic (H&H) analysis, drainage system design, geotechnical engineering, wetland delineation, survey, and permitting assistance to advance the project from study phase to design phase and though construction.

  • East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road
  • East Lake Road East Lake Road

Related Projects