FacebooklinkedininstagramFacebooklinkedininstagram

Verizon Wireless – Ferrisburgh Center Telecommunications Facility

 

Ferrisburgh, Vermont

DuBois & King provided civil/site, electrical, structural, and environmental engineering services to design, permit, and construct a new telecommunications facility in the Town of Ferrisburgh, Vermont. Project included design of an equipment shelter attached to an existing barn designed to resemble existing additions to the barn, 10 ft fiberglass RF transparent extension of the existing Harvestore silo to enclose the telecommunications antennas, and utility services to operate the facility. Services included:

Assistance with site selection
Preparation of lease exhibits
Wildlife, habitat, and wetland assessments
Topographic survey and site plan
Cell tower visual impact simulation
Erosion control
Permitting (local and state, including Act 250)
Design of equipment shelter
Structural design of equipment shelter foundation
Electrical engineering including grounding design
Hearings testimony
Construction documents
Construction phase services

  • Ferrisburgh Center
  • Ferrisburgh Center Ferrisburgh Center

Related Projects