Andover-VT-Route-11-Accelerated-Bridge-Project-Construction-Inspection-1VTrans selected DuBois & King to provide Construction Inspection services for an Accelerated Bridge Project (10 day road closure) on Vermont Route 11 in Andover, Vermont. The project included the replacement of the superstructure, bridge and approach rail, approach slab, and wingwalls, and bridge seat. The project was completed in the 2015 construction season.