The Vermont Department of Forests, Parks, and Recreation engaged D&K to design repairs to a portion of a forest road, which was significantly damaged/washed out by Tropical Storm Irene. Sections of the road are steep and significant repairs and slope stabilization were necessary. Project included design of 50-ft-long retaining wall that required drilling and grouting to an existing ledge surface to provide a secure base, extensive ditching, culvert replacement sizing and design, and several culvert headwalls of varying type (concrete, dry stack, cement masonry).