Converse Road Culvert
Temple, New Hampshire
Study, design, and construction phase engineering for Bridge No. 110/141. D&K completed an alternatives evaluation and recommended replacement of the existing culvert. The firm also provided permit application assistance, prepared final engineering plans and specifications, assisted the Town during the bid phase, and provided the Town with construction administration services.
The original bridge was a 18-foot-long corrugated metal arch with stone headwalls; the culvert was suffering from corrosion, settlement and scour, and had a Federal Sufficiency Rating of 47.4%. The project received funding through the NHDOT Municipal Bridge Aid program and followed the NHDOT Local Public Agency (LPA) process.