FacebooklinkedininstagramFacebooklinkedininstagram

First Crown Point Road Culvert

 

Strafford, New Hampshire

D&K provided study, design, and construction phase engineering for Bridge No. 069/164. D&K completed an alternatives evaluation and recommended replacement of the existing culvert. The firm also provided permit application assistance, prepared final engineering plans and specifications, assisted the Town during the bid phase, and provided the Town with construction administration services.

The original culvert was a 14-foot-long corrugated metal pipe culvert with concrete headwalls and wingwalls; the culvert was suffering from corrosion, missing bolts and sagging. The previous culvert had a Federal Sufficiency Rating of 47.9%. The project received funding through the NHDOT Municipal Bridge Aid program and followed the NHDOT Local Public Agency (LPA) process.

  • 1st Crown Pt Culvert
  • 1st Crown Pt Culvert 1st Crown Pt Culvert
  • 1st Crown Pt Culvert 1st Crown Pt Culvert
  • 1st Crown Pt Culvert 1st Crown Pt Culvert
  • 1st Crown Pt Culvert 1st Crown Pt Culvert
  • 1st Crown Pt Culvert 1st Crown Pt Culvert

Related Projects