FacebooklinkedininstagramFacebooklinkedininstagram

Husky Injection Molding Manufacturing Campus

 

Milton, Vermont

Multidiscipline services for the fast-track design and construction of a world class, 685-acre manufacturing campus. D&K was responsible for all civil/site services. Converted environmentally/archeological sensitive agricultural land into a large environmentally friendly industrial site. D&K provided planning, permitting, design, and construction phase services for the site, utilities, and roadway access. The project required design of an innovative, rapid-build bridge to replace an at-grade railroad crossing. Services included:

Conceptual plans
Utility and communication design
Energy source evaluation
Stormwater management
Field survey and mapping
Resource identification
Wetland delineation
Federal, State, and local permitting (Vermont Act 250)
Roadway, bridge, and parking design
Master Plan for future expansion

  • Husky Manufacturing
  • Husky Manufacturing Campus Husky Manufacturing Campus
  • Husky Manufacturing Campus Husky Manufacturing Campus
  • Husky Manufacturing Campus Husky Manufacturing Campus

Related Projects