The transmission line owner required updated condition information on the foundation and structural support members of 165 high-tension lattice electrical transmission towers. D&K’s structural engineers visited each tower along the entire length of the project, often in remote locations with challenging terrain and access. We used a cloud-based assessment system to allow office personnel to work concurrently with team members in the field. Our team provided a real-time inspection report, including a geodatabase with tower locations tied to photos and descriptions with recommended inspection cycles and maintenance. 

Service Areas:

Project Elements

• Inspection of 165 high-tension lattice transmission towers in remote locations
• Cloud-based inspection system to provide real-time data