WRJ VA Electrical Deficiencies Upgrades

White River Junction, Vermont | US Department of Veterans Affairs

To improve energy efficiency and upgrade for code at an 80-year-old VA Medical Center campus, D&K designed and provided construction services for upgrades to the electrical systems. The 450,000-SF, multi-building campus includes offices, in- and out-patient hospital care areas, cafeterias, and support functions. 

Service Areas:
Markets:

Project Elements

• Upgrades to interior lighting, electrical distribution, nurse call, and site lighting
• Lighting calculations (photometric site plans) of spaces and replacement with efficient high-performance T8 fixtures
• Upgrades to distribution systems
• Facility-wide upgrades to install energy efficient, exterior LED lights
• Construction phasing was developed to maintain power to the buildings
• Emergency power systems reviewed and expanded
• Medium voltage exterior switch added
• Reconfigured feeders for reliability
• Construction phase services

Awards

ACEC-VT Merit Award for Engineering Excellence