Water Tank and System Upgrades
Proctor, Vermont
DuBois & King repackaged construction documents and provided redesign, cost estimating, bidding assistance, and construction phase services for drinking water supply and storage improvements, as well as minor access road improvements in the Town of Proctor. D&K staff separated one construction contract into two, and repackaged contracts to incorporate cost-saving features as a means to reduce overall construction costs to the Town. D&K assisted in bringing projects within budget and brought the water system back into compliance with State and Federal requirements, including longstanding violations involving Disinfection Byproducts (DBPs):
Replacement of the East Side Water Storage Tank
Tower Road improvements
Replacement of an isolation valve/improvements to the West Tank