Mechanical Engineering

  • Georgia Fire Station

    D&K provided design-build renovations on this 9,000-SF fire station. Upgrades included administrative offices, a training room, and a high-bay apparatus area for eight emergency vehicles. Our civil/site team provided permit work and applications, building surveys, grade development, stormwater management, driveway and parking areas, ADA-accessible walkways, and three 14,000-gallon buried water storage tanks for emergency vehicle…

  • Randolph Wastewater Treatment Facility

    The 40-year-old wastewater treatment facility, originally designed for a 20-year service life, was past due for a total treatment process change and facility upgrade. The project objectives included: utilize a state-of-the-art treatment process, design capacity for nitrogen removal, consider operational efficiencies and long-term operating costs, address issues with the location in a floodplain, and develop…

  • Vergennes 9B Upgrades

    The Vergennes 9B Hydroelectric facility is a historic hydroelectric plant on the Otter Creek centrally located in downtown Vergennes. Its penstocks were nearing the end of their service lives, and the facility was in need of reconfiguration and operational improvements. D&K worked with the client to design new penstocks and reconfigure the powerhouse to significantly…

  • Central Vermont Medical Center

    With 122 beds, the Central Vermont Medical Center serves the 26 communities of Central Vermont and provides a variety of inpatient and outpatient services. For decades, CVMC has entrusted D&K to assist with the support of their projects with civil-site, permitting, traffic engineering, and MEP needs. Our extensive work on the CVMC campus has provided…

  • Gifford Health Care

    For more than 25 years, D&K has served as an integral partner in the development of Gifford Health Care campuses throughout central Vermont. Working collaboratively with Gifford staff, architects, specialty consultants, and stakeholders, our team’s designs have led or supported the construction of new hospital buildings, independent and assisted living communities, medical office buildings, dental,…

  • Cochecho Pump Station Upgrades

    The city completed the design of improvements to the existing wastewater pump station. Through that process, it became evident that the existing system had reached the end of its operating life, and selected components should be replaced rather than upgraded to provide increased reliability, energy efficiency, safety, and compatibility with other city pump stations. D&K…

  • Lagoon Aeration Upgrade

    Orwell’s wastewater treatment facility includes an aerated lagoon facility that provides secondary treatment and chlorine disinfection of wastewater. The facility’s aging lagoon aeration system was a submerged lateral system that had become inadequate and inefficient. D&K provided design, bid, construction management, and startup assistance services to upgrade the lagoon aeration system to meet current standards….