Pittsford Village Center Sidewalk Study

Pittsford, Vermont | Town of Pittsford

The Town of Pittsford and the RRPC required an assessment of needs and options for the construction of sidewalks linking key areas around Pittsford’s village center to improve pedestrian connectivity and safety, linking existing sidewalks along the US 7 corridor, Arch Street, Pleasant Street, Furnace Road, and Elm Street. D&K provided a scoping study and evaluation of each corridor to assist the Town in prioritizing the phasing and investment of each sidewalk project.

Markets:

Project Elements

• The project provides a clear framework and timeline for capital investments.
• Enhancement and extension of the sidewalk network in and around a village center.

Sustainable Elements

The project evaluates measures to encourage non-motorized transportation.