Page Road Bridge
Spanning 12 ft across Bela Brook, a hydraulically inadequate metal arch culvert had begun to rust and had a history of scour damage. The Town of Bow chose to replace the structure, which had been replaced on the NHDOT Redlist. Our team designed a structure that increased the crossing’s hydraulic capacity by lengthening the span…
