Dam Engineering

  • Dam Engineering

    D&K’s dam teams offer a full complement of technical services to dam owners: investigation, hydrologic and hydraulic studies, dam breach analyses, emergency action plans, needs analyses, flood damage surveys, subsurface investigations, evaluation of alternatives, cost estimating, community coordination, state and federal permit assistance, design, plans and specifications, and construction administration. D&K dam engineers are supported…

  • Rainbow Dam Rehabilitation

    Rainbow Dam is a high-hazard, 2,000-ft-long by 42-ft-high earthen embankment flood-control dam bounded immediately upstream by a public school campus and downstream by a public park and large neighborhood. The auxiliary spillway did not have adequate hydraulic capacity during the freeboard hydrograph event, and the dam’s internal drainage system did not meet dam safety requirements….

  • Robin Hood Dam

    Framed by a public park and a residential area and carrying a city street, Robin Hood Dam was reclassified by the State of New Hampshire as a high-hazard dam, and its spillway did not have the capacity to meet New Hampshire Dam Safety requirements. The City of Keene engaged D&K to evaluate the dam, develop…

  • Upper Wilson Pond Dam

    The Upper Wilson Pond Dam is a small, high-hazard, earth embankment dam impounding a recreation pond. Recently found to be in poor condition, the dam is owned by the Town of Swanzey, and the pond is bounded by homes and properties located within the City of Keene. D&K’s project team completed a study that evaluated…

  • Sweet Pond Dam

    Sweet Pond Dam is a 20-ft-high by 77-ft-long circa-1928 dam that impounds an 18-acre pond with a contributing drainage area of approximately 1 square mile. The dam sustained uncontrolled and excessive seepage through highly fractured and weathered bedrock and posed a barrier to AOP. D&K provided planning, evaluation, alternatives analysis, preliminary and final design, permitting…