Stormwater Design for US 2 Segment 1
The roadway/stormwater component of the Cabot-Danville US 2 safety project consisted of the reconstruction of three segments totaling 4.25 miles. D&K developed stormwater treatment and control to minimize right-of-way impacts and provided planning, design, and permitting assistance.
