Vermont

  • Alburgh Water System Improvements

    The Alburgh Village Water System (WSID 0005316) uses a surface water intake from Lake Champlain, a water treatment facility, and water mains to supply approximately 400 service connections and a population of 576. The water system included an elevated painted steel storage tank constructed in 1988 that served Alburgh’s Designated Village Center, South Alburgh Fire District No….

  • Hermitage Club RCx

    D&K provided Retro-Commissioning (RCx) services for the mechanical and DDC controls systems. This multi-purpose members-only facility comprises four stories and includes 90,000 SF of space. The building was not fully utilized since its original construction and since the recent subsequent completion of an addition. Our commissioning team’s RCx services reviewed mechanical equipment performance and BMS…

  • Weidmann BM2 Expansion

    Weidmann Electrical Technology, a producer of electrical transformer insulation material, initiated a 38,000–SF expansion to house Board Machine 2 (BM2), a 2,000,000-lb hot press that supplements production capacity. To meet schedule goals, the project was fast-tracked and construction-managed. D&K provided conceptual, preliminary, and final design services, as well as bid/negotiation assistance and construction phase services…

  • RUT Runway 19 Safety Area

    To comply with contemporary FAA safety regulations, the Vermont Agency of Transportation needed to install a 60-ft runway safety area and 300-ft runway extension to Runway 19 at Rutland-Southern Vermont Regional Airport. Constructed on a small promontory, the airport had already maximized the use of available length, and a retaining wall was constructed to support…

  • US 7 Segment 6 Reconstruction

    The Town of Brandon needed to efficiently implement a wide range of improvements while minimizing the total duration of disturbance to a vital and distinctive downtown core that sees a high volume of passenger vehicle and heavy truck traffic. This US 7 Segment 6 project—a National Highway Performance Program project—replaced sidewalks, lighting, water, sewer, and…

  • Dion Student Center and Housing

    St. Michael’s College chose to expand its housing and student life facilities with two new four-story buildings that use a one-story connector link. Architectural design requirements included extensive use of glass, non-load-bearing walls, and minimal columns in large rooms. D&K was responsible to provide structural design for the building’s complex framing systems, as well as…

  • Opthamology and Dermatology MOB

    D&K’s MEP team developed construction drawings and specifications and performed site visits and construction administration services for this $12M project. The project consisted of reception areas, waiting rooms, exam rooms, dilation spaces, procedure rooms, lab spaces, nurse pods, offices, conference rooms, break rooms, staff lockers, restrooms, and building support spaces. The electrical design consisted of…

  • US Coast Guard

    DuBois & King leads a five-year on-call contract to provide civil, geotechnical, structural, and MEP engineering; environmental documentation and permitting assistance; land survey; landscape architecture; and construction phase services. The contract serves Coast Guard Units located throughout the Coast Guard First District, including Maine, Massachusetts, Connecticut, Eastern New York, New Jersey, Rhode Island, Vermont, and…