Vermont

  • Northfield Trail Wayfinding Plan

    The Town of Northfield sought to improve wayfinding for public trail networks, parking, and access points. Serving mountain bikers, skiers, trail runners, hikers, and ROTC students, the Town Forest and Norwich University trails are located in mountainous terrain with accesses in a residential area and on University property. The town maintains a separate school trail…

  • Merchants Row Rain Garden

    To collect, infiltrate, and treat stormwater from a one-block, one-way street with parking and sidewalks, D&K designed a rain garden and sidewalk extension. The project disconnects a significant amount of impervious surface from the closed drainage system and provides additional space for pedestrians to safely navigate the crossings at this four-way intersection. D&K provided survey,…

  • 3340 Line Upgrade 

    At the Gorge Hydroelectric facility, power transmission lines cross the Winooski River close to the dam spillway presenting a substantial icing issue (from spillway spray) for the conductors. The facility’s staff regularly used a nearby utility bridge to stage ice removal activities, and the client was interested in modifying the transmission line to reduce or…

  • Flood Study of the Mad River Area

    The Mad River Valley is a rural though populous region characterized by steep slopes, narrow river channels, and a relatively high level of transportation infrastructure and building stock along valley floors and roads accessing resort areas. D&K worked with the CVRPC to survey the area and develop a study that cataloged the hydrology and hydraulics…

  • Fair Haven Park & Ride

    Located in the downtown core, adjacent to the Village Green, the Fair Haven Park and Ride lot consisted of lightly marked spaces with no separation from the roadway on either side. The large contiguous area of paved surface, lack of pedestrian facilities, and minimal striping provided a low level of service. Frequently used by residents…

  • Eval of WWTFs & Pump Stations

    The City of Burlington required a 20-year engineering evaluation of its wastewater treatment plants, collection system, and pump stations; the development of a 10-year capital plan; and consultant services related to wastewater revenue bonds. Satisfying the bond requirements required D&K to provide recommendations regarding (1) operation and maintenance, (2) ways to improve the operation of…