  • Bangor City Hall

    The City of Bangor conducts operations in a 100+-year-old former US Courthouse and Post Office building, which includes approximately 45,000 SF of space. Over a two-year period, the City invested approximately $10M to renovate this historic city hall. Renovations to the first floor included flexible workspaces, replacement/upgrade of the HVAC system, a new elevator, and…

  • Sweet Pond Dam

    Sweet Pond Dam is a 20-ft-high by 77-ft-long circa-1928 dam that impounds an 18-acre pond with a contributing drainage area of approximately 1 square mile. The dam sustained uncontrolled and excessive seepage through highly fractured and weathered bedrock and posed a barrier to AOP. D&K provided planning, evaluation, alternatives analysis, preliminary and final design, permitting…

  • Dunklee Road Bridge

    The Town of Bow needed to replace a 20-ft, rigid-frame culvert with inadequate scour protection, foundations, and geometry. The roadway serves heavy truck traffic and intersects with NH 3A, a state highway frequently used to bypass a tolled section of I-93 near the Interstate I-89 intersection with I-93. D&K designed a replacement structure to address…

  • Retaining Wall, North Street

    The City of Montpelier needed to replace a 12-ft-high by 70-ft-long retaining wall located within several feet of a home and serving a low-volume residential road. D&K provided survey, civil, geotechnical, and structural engineering and permitting to replace the metal bin wall with a modular concrete block wall system. We also provided bid and construction…

  • Bull Run Slope Stabilization

    Bull Run Road, a two-lane residential road abutting a perennial stream, underwent a slope failure during a large storm event. Heavy stream flows scoured the toe of the roadway embankment causing the roadway slope to fail and restrict capacity to one lane. The Town of Roxbury secured FEMA funds to evaluate the situation and implement…

  • Vergennes 9B Upgrades

    The Vergennes 9B Hydroelectric facility is a historic hydroelectric plant on the Otter Creek centrally located in downtown Vergennes. Its penstocks were nearing the end of their service lives, and the facility was in need of reconfiguration and operational improvements. D&K worked with the client to design new penstocks and reconfigure the powerhouse to significantly…