Construction Observation

  • Construction Observation

    D&K’s resident project representatives (RPRs) operate as a supporting points of contact for the owner, design team, contractor, and appropriate stakeholders, such as regulators. Our staff observe the contractor’s activities on a full-time basis or periodically on highway, bridge, streetscape, dam, water and wastewater facility, airport, stormwater, site improvement, building, and other project types. D&K…

  • Alburgh Water System Improvements

    The Alburgh Village Water System (WSID 0005316) uses a surface water intake from Lake Champlain, a water treatment facility, and water mains to supply approximately 400 service connections and a population of 576. The water system included an elevated painted steel storage tank constructed in 1988 that served Alburgh’s Designated Village Center, South Alburgh Fire District No….

  • Weidmann BM2 Expansion

    Weidmann Electrical Technology, a producer of electrical transformer insulation material, initiated a 38,000–SF expansion to house Board Machine 2 (BM2), a 2,000,000-lb hot press that supplements production capacity. To meet schedule goals, the project was fast-tracked and construction-managed. D&K provided conceptual, preliminary, and final design services, as well as bid/negotiation assistance and construction phase services…

  • RUT Runway 19 Safety Area

    To comply with contemporary FAA safety regulations, the Vermont Agency of Transportation needed to install a 60-ft runway safety area and 300-ft runway extension to Runway 19 at Rutland-Southern Vermont Regional Airport. Constructed on a small promontory, the airport had already maximized the use of available length, and a retaining wall was constructed to support…

  • US 7 Segment 6 Reconstruction

    The Town of Brandon needed to efficiently implement a wide range of improvements while minimizing the total duration of disturbance to a vital and distinctive downtown core that sees a high volume of passenger vehicle and heavy truck traffic. This US 7 Segment 6 project—a National Highway Performance Program project—replaced sidewalks, lighting, water, sewer, and…

  • Accelerated Bridge Testing Facility 

    Rutgers University developed a bridge deck testing system consisting of mounting hardware for experimental decks and appurtenances and a motorized, loadable, and wheeled reciprocating sled that mimics a tractor-trailer crossing the bridge deck. The BEAST is designed to expose full-scale bridge specimens to rapid-cycling, changing environmental conditions, and extreme traffic loading to induce accelerated deterioration…

  • Hooksett Nature-like Fishway (NLF)

    The Hooksett Hydroelectric Project includes a 1.6 MW run-of-the-river hydroelectric power generation dam that is a barrier to aquatic organism passage (AOP), including Blueback Herring, American Eel, and American Shad. D&K worked closely with officials from the U.S. Fish and Wildlife Service and the National Oceanic and Atmospheric Administration regarding the details of the design,…

  • Chroma Tech Slope and Stormwater

    To support continued and upgraded use of its site for light industrial purposes, Chroma Tech needed to stabilize an adjacent slope. The aim of the project was to improve site stability and minimize erosion and stormwater pollution directly behind the facility. D&K evaluated the site and worked with regulators, the client, and a grant funding…