Construction Observation

  • Vergennes 9B Upgrades

    The Vergennes 9B Hydroelectric facility is a historic hydroelectric plant on the Otter Creek centrally located in downtown Vergennes. Its penstocks were nearing the end of their service lives, and the facility was in need of reconfiguration and operational improvements. D&K worked with the client to design new penstocks and reconfigure the powerhouse to significantly…

  • Green River Covered Bridge

    A large storm event washed out most of the approach to one abutment and damaged the superstructure of the Green River Covered Bridge. The Town of Greenfield required long-term repairs and upgrades to this historic resource. D&K evaluated the structure, provided rehabilitation design and permitting assistance, and performed bid and construction contract administration and observation…

  • Gooseneck Bend Slope

    Along Otter Creek, a 160-ft-long, 20-ft-high slide occurred on the Gooseneck Bend Road embankment, disrupting the roadway’s stability. The Town of Weybridge secured FEMA funding and engaged D&K to evaluate the failure and design long-term improvements that armored the embankment along the roadway using stone armoring and plantings, stabilizing the immediately adjacent gravel road.  

  • South Ridge Development

    DuBois & King (D&K) provided construction administration and observation services for the installation of new water, sewer, stormwater, phone, cable, and power utilities to serve a new neighborhood within the South Ridge development. Our team reviewed the stormwater collection and treatment systems for compliance with the project permits and state rules.  D&K assisted with Act…

  • Lincoln Levee Repair

    In response to repeated storm damage to this 1,900-ft-long, circa 1960s Army Corps granite block protection levee, the Town of Lincoln needed to repair the levee to maintain an acceptable level of service. DuBois & King evaluated the structural, hydrologic and hydraulic, civil, and structural conditions and requirements of this site along the Pemigewasset River….

  • Central Vermont Medical Center

    With 122 beds, the Central Vermont Medical Center serves the 26 communities of Central Vermont and provides a variety of inpatient and outpatient services. For decades, CVMC has entrusted D&K to assist with the support of their projects with civil-site, permitting, traffic engineering, and MEP needs. Our extensive work on the CVMC campus has provided…

  • Cochecho Pump Station Upgrades

    The city completed the design of improvements to the existing wastewater pump station. Through that process, it became evident that the existing system had reached the end of its operating life, and selected components should be replaced rather than upgraded to provide increased reliability, energy efficiency, safety, and compatibility with other city pump stations. D&K…