Environment

  • Lincoln Levee Repair

    In response to repeated storm damage to this 1,900-ft-long, circa 1960s Army Corps granite block protection levee, the Town of Lincoln needed to repair the levee to maintain an acceptable level of service. DuBois & King evaluated the structural, hydrologic and hydraulic, civil, and structural conditions and requirements of this site along the Pemigewasset River….

  • ARPA Healthy Homes

    Manufactured housing communities in Vermont provide practical housing solutions; however, some of these communities are disproportionately affected by environmental issues. The Vermont Department of Environmental Conservation sought consultants to provide Preliminary Engineering Reports (PERs) and design solutions that responded to the specific challenges faced by MHCs and a backlog of failing wastewater, potable water, and…

  • Manchester Job Corps

    For the construction of the new US Department of Labor (DOL) New Hampshire Job Corps Center, DuBois & King’s survey crew tied into existing boundary corners and collected 1-ft contour intervals on an undeveloped 20-acre wooded parcel. Our surveyors developed the topographic survey into a 3D-model base plan to assist our design team in performing…

  • Community Wastewater System

    The Addison Town Hall and Addison Community Baptist Church needed a centralized wastewater system to reestablish use of the historic Town Hall building, which sat vacant for nearly a decade. The structure required significant renovation, and its marginal (mostly clay) soils and a high water table made a conventional on-site wastewater system infeasible. At the…

  • Central Vermont Medical Center

    With 122 beds, the Central Vermont Medical Center serves the 26 communities of Central Vermont and provides a variety of inpatient and outpatient services. For decades, CVMC has entrusted D&K to assist with the support of their projects with civil-site, permitting, traffic engineering, and MEP needs. Our extensive work on the CVMC campus has provided…

  • Gifford Health Care

    For more than 25 years, D&K has served as an integral partner in the development of Gifford Health Care campuses throughout central Vermont. Working collaboratively with Gifford staff, architects, specialty consultants, and stakeholders, our team’s designs have led or supported the construction of new hospital buildings, independent and assisted living communities, medical office buildings, dental,…

  • Cochecho Pump Station Upgrades

    The city completed the design of improvements to the existing wastewater pump station. Through that process, it became evident that the existing system had reached the end of its operating life, and selected components should be replaced rather than upgraded to provide increased reliability, energy efficiency, safety, and compatibility with other city pump stations. D&K…