Environment

  • Cambridge Greenway

    Currently, the Greenway Trail “loop” requires two uncontrolled crossings of VT 108, traveling along the edges of roads, and traversing unofficial trails on private property. D&K developed a scoping study to extend the Greenway Trail to create a loop for pedestrians and cyclists through the Village of Jeffersonville to provide safer access to key destinations….

  • Sweet Pond Dam

    Sweet Pond Dam is a 20-ft-high by 77-ft-long circa-1928 dam that impounds an 18-acre pond with a contributing drainage area of approximately 1 square mile. The dam sustained uncontrolled and excessive seepage through highly fractured and weathered bedrock and posed a barrier to AOP. D&K provided planning, evaluation, alternatives analysis, preliminary and final design, permitting…

  • St. Paul Reconstruction, Great Streets BTV 

    The Great Streets BTV planning document, coauthored by D&K, represented a holistic effort to make Burlington’s downtown core more appealing for users of all modes of transportation and to enhance the area’s ability to engage its natural and cultural assets. D&K’s approach to the project incorporated the first segments of roadway designed and constructed to the Great Streets standards….