Water Resources

  • Cross Brothers Dam Removal

    The Cross Brothers Dam was no longer used for a long-defunct mill, and the impoundment had silted into the dam’s crest. The dam, built in 1924 and classified as a Low-Hazard dam by the State of Vermont, was a complete obstruction to aquatic organism passage with the potential to further damage water quality. D&K provided…

  • Ann Jackson Dam Removal

    An aging concrete and masonry dam was deemed structurally deficient by state regulators, and the owners could not justify the expense of reconstruction. D&K connected the owners with the NRCS to fund the construction, which included the removal and disposal of the dam and active restoration of the stream channel. Our team designed the removal…

  • Molly’s Falls Channel Relocation

    The Cabot-Danville US 2 Segment 1 highway stormwater improvements included relocating a reach of Molly’s Falls Brook. The project required site inspection coordinated with the Vermont Agency of Natural Resources District Fisheries Biologist, Stream Alteration Engineer, and VTrans representatives. To relocate the brook, D&K collected site data and developed a design utilizing hydraulic engineering and…

  • Hydro & Substation Projects for GMP

    Green Mountain Power (GMP) is a private electrical utility provider that maintains much of Vermont’s electrical distribution and hydroelectric power-generating infrastructure, solar farms, and natural gas cogeneration facilities. As GMP has grown through expansions and small utility provider acquisitions over the past 20 years, D&K has supported approximately 200 projects, and we continue to provide…

  • Lower Wilson Pond Dam

    The Town of Swanzey needed to improve the stability and safety of an earthen dam serving an 80-acre pond. The pond supports recreation and enhances the value of the homes located along its shoreline. The dam had seepage issues and did not meet current dam safety standards. Using articulated concrete blocks as overtopping protection, DuBois…

  • VT Highway Slope Stabilizations

    In the aftermath of Tropical Storm Irene, many roadways throughout Vermont were severely damaged due to flood waters from adjacent streams and rivers. For four sites along VT 100, 100B, 14, and 125, D&K designed slope stabilization and appurtenant roadway repairs; for a site on VT 125, D&K designed a small box culvert replacement. For…