Education

  • Dion Student Center and Housing

    St. Michael’s College chose to expand its housing and student life facilities with two new four-story buildings that use a one-story connector link. Architectural design requirements included extensive use of glass, non-load-bearing walls, and minimal columns in large rooms. D&K was responsible to provide structural design for the building’s complex framing systems, as well as…

  • Accelerated Bridge Testing Facility 

    Rutgers University developed a bridge deck testing system consisting of mounting hardware for experimental decks and appurtenances and a motorized, loadable, and wheeled reciprocating sled that mimics a tractor-trailer crossing the bridge deck. The BEAST is designed to expose full-scale bridge specimens to rapid-cycling, changing environmental conditions, and extreme traffic loading to induce accelerated deterioration…

  • Dartmouth College

    For more than 15 years, D&K has served as an engineer-of-record for structural, mechanical, and electrical projects to renovate, maintain, and upgrade historic and contemporary classroom, laboratory, residence hall, office, and athletic facilities in addition to general campus infrastructure, such as steam tunnels, standby power, fall protection systems, and electrical vaults.

  • South Hall Student Housing

    D&K provided engineering services for a new $17.5M LEED-Gold-certified five-story residence hall that houses up to 283 students, serving as a benchmark for new construction and renovation projects on campus. D&K provided civil/site design, permitting, topographic and boundary surveys, utilities, and cost estimates. Site improvements included grading, stormwater management system, access road/parking, pavement marking/signage, ADA…

  • Vermont Green Schools Stormwater

    Following the inception of Vermont’s Three-Acre Stormwater Rule, schools throughout Vermont needed to adapt their campuses to manage stormwater in accordance with Vermont Stormwater General Permit 3-9050. To help schools successfully manage these challenges, D&K has provided engineering and environmental services for feasibility studies and the design of stormwater improvements for five schools. The projects…

  • Manchester Job Corps

    For the construction of the new US Department of Labor (DOL) New Hampshire Job Corps Center, DuBois & King’s survey crew tied into existing boundary corners and collected 1-ft contour intervals on an undeveloped 20-acre wooded parcel. Our surveyors developed the topographic survey into a 3D-model base plan to assist our design team in performing…

  • Burlington School District Travel Plan

    The City of Burlington and Burlington School District required an assessment of regional, neighborhood, and individual school campuses’ travel patterns and access constraints. A school travel plan was needed for ten campuses, including elementary, middle, and high schools, to make recommendations for small- and large-scale products to increase equitable access to public school for all….