Vermont

  • Wise Campus Center

    D&K provided civil/site engineering and construction phase services for site development associated with the construction of a new student center. Services included design for access and parking, including pavement markings and signage, walkways and paths, fencing, drainage, stormwater management, water system, and gravity wastewater system. The stormwater management system was designed with subsurface retention chambers,…

  • West Hall Student Housing

    To expand on-campus housing, NU needed a new 286-bed, five-story, 75,000-SF student housing facility. The project delivery method was unconventional, as the owner acted as the Construction Manager. D&K provided a range of services, including structural engineering. Structural systems consist of precast hollow core planks supported by structural steel beams and columns to facilitate low…

  • Brattleboro School Energy Efficiency Upgrades

    When the Brattleboro School required expansion and renovation, D&K provided electrical and mechanical design to implement energy improvements for this 336,000-SF facility serving grades 6–12. Efficiency upgrades included daylighting controls; occupancy sensors; heat recovery system; high-efficiency air conditioning system; wood chip boiler as the primary heat source; CO2 sensors; VFDs on select air handling heat…

  • CCV Montpelier Academic Addition

    CCV sought to expand its academic facilities by adding a 12,000-SF, two-story space. D&K provided mechanical, electrical, and plumbing design for the new space, including nine classrooms and laboratory and office spaces. Mechanical design included high-efficiency boilers with variable-speed pumps, variable refrigerant flow (VRF) heat pumps, general and specialty exhaust system requirements, and Direct Digital…

  • Sucker Brook Stream Stabilization

    Sucker Brook was a deeply incised stream channel that threatened nearby infrastructure and sent an estimated one ton of phosphorus per year downstream toward Lake Champlain. The project goals included a reduction of sediment loading and erosion and the restoration of aquatic and riparian habitat while minimizing construction and maintenance costs. D&K prepared conceptual and…