WSF and Leachate Collection, Gray Farm
The Gray Farm needed a new waste storage facility and leachate collection system. D&K visited the site and conducted field survey and mapping, soil investigations, preliminary engineering, final design, and construction phase services while following the requirements of the NRCS EQIP program.
