Stormwater

  • Greenville Municipal Airport

    Located near Moosehead Lake, 3B1 is served by a 4,000-ft-by-75-ft runway and a 3,001-ft-by-75-ft crosswind runway, hangars, tie-downs, a fuel farm, and a terminal. Since 2017, D&K’s aviation planners and engineers have served as the lead consultant team at the airport. Recent projects have focused on the addition of taxiways, general enhancements to the terminal…

  • BTV Wetland Mitigation

    The Burlington International Airport (BTV) planned for expansions that impacted nearby wetlands, including 4.9 acres of degraded upland habitat and 12.5 acres of degraded wetland habitat. To support the expansions, D&K designed a wetland mitigation site, collected a topographic survey for 49 acres, provided construction stakeout, and conducted post-project monitoring. 

  • RUT Runway 1 Safety Improvements

    VTrans, in cooperation with the Federal Aviation Administration, developed a program to bring Rutland’s Runway 1/19 into compliance with the Runway Safety Area (RSA) Program. Rutland-Southern Vermont Regional Airport is a Part 139 airport served by a 5,003-foot runway with a minimal apron surrounding the terminal buildings. Under an Aviation retainer contract, D&K assisted VTrans…