Construction Phase Services

  • Central Vermont Medical Center

    With 122 beds, the Central Vermont Medical Center serves the 26 communities of Central Vermont and provides a variety of inpatient and outpatient services. For decades, CVMC has entrusted D&K to assist with the support of their projects with civil-site, permitting, traffic engineering, and MEP needs. Our extensive work on the CVMC campus has provided…

  • Cochecho Pump Station Upgrades

    The city completed the design of improvements to the existing wastewater pump station. Through that process, it became evident that the existing system had reached the end of its operating life, and selected components should be replaced rather than upgraded to provide increased reliability, energy efficiency, safety, and compatibility with other city pump stations. D&K…

  • Lagoon Aeration Upgrade

    Orwell’s wastewater treatment facility includes an aerated lagoon facility that provides secondary treatment and chlorine disinfection of wastewater. The facility’s aging lagoon aeration system was a submerged lateral system that had become inadequate and inefficient. D&K provided design, bid, construction management, and startup assistance services to upgrade the lagoon aeration system to meet current standards….

  • Northfield Wastewater Treatment Facility

    The 40-year-old Northfield Wastewater Treatment Facility (WWTF) required a comprehensive upgrade of the facility and process conversion from Trickling Filter (TF) to Sequencing Batch Reactor (SBR) to comply with stringent phosphorous limitations. The site was constrained by the railroad and the Dog River, requiring geotechnical measures to protect rails. D&K conducted all professional engineering services…

  • Emergency Siphon Replacement

    During the surge of Tropical Storm Irene, flows at the town’s wastewater treatment facility decreased by 60%. It was determined that a double-barrel sewer siphon, consisting of an inlet and outlet structure, was destroyed by the storm when the Third Branch of the White River migrated 90 feet to the northeast. D&K provided design and…

  • Rangeley Stephen A. Bean Municipal Airport

    Under a multi-year contract and an expedited schedule, DuBois & King provided guidance on planning, technical, environmental, and regulatory issues. Projects under this contract included a Capital Improvement Plan update, technical master plan update, runway extension, hangar area development, terminal apron expansion, Environmental Assessment, construction of a full parallel taxiway, snow removal equipment acquisition, a…