  • Randolph Wastewater Treatment Facility

    The 40-year-old wastewater treatment facility, originally designed for a 20-year service life, was past due for a total treatment process change and facility upgrade. The project objectives included: utilize a state-of-the-art treatment process, design capacity for nitrogen removal, consider operational efficiencies and long-term operating costs, address issues with the location in a floodplain, and develop…

  • Robin Hood Dam

    Framed by a public park and a residential area and carrying a city street, Robin Hood Dam was reclassified by the State of New Hampshire as a high-hazard dam, and its spillway did not have the capacity to meet New Hampshire Dam Safety requirements. The City of Keene engaged D&K to evaluate the dam, develop…

  • Upper Wilson Pond Dam

    The Upper Wilson Pond Dam is a small, high-hazard, earth embankment dam impounding a recreation pond. Recently found to be in poor condition, the dam is owned by the Town of Swanzey, and the pond is bounded by homes and properties located within the City of Keene. D&K’s project team completed a study that evaluated…

  • Bangor City Hall

    The City of Bangor conducts operations in a 100+-year-old former US Courthouse and Post Office building, which includes approximately 45,000 SF of space. Over a two-year period, the City invested approximately $10M to renovate this historic city hall. Renovations to the first floor included flexible workspaces, replacement/upgrade of the HVAC system, a new elevator, and…

  • Sweet Pond Dam

    Sweet Pond Dam is a 20-ft-high by 77-ft-long circa-1928 dam that impounds an 18-acre pond with a contributing drainage area of approximately 1 square mile. The dam sustained uncontrolled and excessive seepage through highly fractured and weathered bedrock and posed a barrier to AOP. D&K provided planning, evaluation, alternatives analysis, preliminary and final design, permitting…