Water + Dams + Hydro

  • Statewide Roadway and Traffic Engineering

    To manage the development of ancillary highway and safety projects in scoping, design, and construction phases, the Vermont Agency of Transportation engages on-call consultants to provide engineering evaluation, design, permitting, and appurtenant professional services. D&K provides services under a statewide contract developing projects that enhance traffic control and signing, intersections, slopes, rail crossings, park-and-rides, rest…

  • Sucker Brook Stream Stabilization

    Sucker Brook was a deeply incised stream channel that threatened nearby infrastructure and sent an estimated one ton of phosphorus per year downstream toward Lake Champlain. The project goals included a reduction of sediment loading and erosion and the restoration of aquatic and riparian habitat while minimizing construction and maintenance costs. D&K prepared conceptual and…

  • Union Village Dam Removal

    The New Hampshire Department of Environmental Services identified the 1861 concrete and masonry Union Village Dam as high-hazard and deficient in a number of areas. The owners’ preferred option was to remove the dam to reduce potential hazards and remove a hydraulic and aquatic organism passage barrier from the river, restoring the river to a…

  • Cross Brothers Dam Removal

    The Cross Brothers Dam was no longer used for a long-defunct mill, and the impoundment had silted into the dam’s crest. The dam, built in 1924 and classified as a Low-Hazard dam by the State of Vermont, was a complete obstruction to aquatic organism passage with the potential to further damage water quality. D&K provided…