Montpelier

  • Retaining Wall, One Taylor Street

    The City of Montpelier, in cooperation with the Federal Transit Authority and the Vermont Agency of Transportation, was redeveloping a brownfield site for a transit center, parking, and multiuse path on the banks of the Winooski River. The project required stabilization of a 135-ft-long by 27-ft-high section of river embankment. D&K provided geotechnical, civil, and…

  • Retaining Wall, North Street

    The City of Montpelier needed to replace a 12-ft-high by 70-ft-long retaining wall located within several feet of a home and serving a low-volume residential road. D&K provided survey, civil, geotechnical, and structural engineering and permitting to replace the metal bin wall with a modular concrete block wall system. We also provided bid and construction…

  • CCV Montpelier Academic Addition

    CCV sought to expand its academic facilities by adding a 12,000-SF, two-story space. D&K provided mechanical, electrical, and plumbing design for the new space, including nine classrooms and laboratory and office spaces. Mechanical design included high-efficiency boilers with variable-speed pumps, variable refrigerant flow (VRF) heat pumps, general and specialty exhaust system requirements, and Direct Digital…

  • Stormwater, National Life Campus

    The National Life of Vermont campus had stormwater conveyance and discharge systems that flow over steep banks and connect into the municipal system on Memorial Drive. Over time, flow through a section of the corrugated metal pipe began to leak at the joints causing erosion around and undermining of the pipe. D&K evaluated existing conditions,…