Survey and Mapping

  • Northfield Wastewater Treatment Facility

    The 40-year-old Northfield Wastewater Treatment Facility (WWTF) required a comprehensive upgrade of the facility and process conversion from Trickling Filter (TF) to Sequencing Batch Reactor (SBR) to comply with stringent phosphorous limitations. The site was constrained by the railroad and the Dog River, requiring geotechnical measures to protect rails. D&K conducted all professional engineering services…

  • Statewide Roadway and Traffic Engineering

    To manage the development of ancillary highway and safety projects in scoping, design, and construction phases, the Vermont Agency of Transportation engages on-call consultants to provide engineering evaluation, design, permitting, and appurtenant professional services. D&K provides services under a statewide contract developing projects that enhance traffic control and signing, intersections, slopes, rail crossings, park-and-rides, rest…

  • Rangeley Stephen A. Bean Municipal Airport

    Under a multi-year contract and an expedited schedule, DuBois & King provided guidance on planning, technical, environmental, and regulatory issues. Projects under this contract included a Capital Improvement Plan update, technical master plan update, runway extension, hangar area development, terminal apron expansion, Environmental Assessment, construction of a full parallel taxiway, snow removal equipment acquisition, a…

  • On-Call Services for Verizon Sites

    To provide wide-ranging, reliable, and high-capacity coverage, Verizon Wireless renovates its facilities, establishes new sites, and constructs telecommunication installations on existing, prominent structures. D&K has served more than 200 of Verizon’s locations throughout Vermont. Sites range from locations in buildings, on farm silos, and at other urban locations or in remote rural, mountain, and wooded…

  • GMC Emergency Power Upgrades

    Gifford’s Medical Center’s (GMC) emergency power system required an evaluation and a number of facility upgrades. D&K’s multidisciplinary team provided MEP and structural design for a pad-mounted transformer, service entrance, generator, service entrance power distribution, transfer switches, dry-type transformer, and related feeder work. Mechanical upgrades included a roof-mounted air handler and associated piping design. Structural…

  • US VA Architect-Engineer IDIQ

    To address the evolving needs of US service members, the VA is committed to maintaining and renovating its facilities and campuses. For over a decade, D&K’s civil, structural, mechanical, and electrical engineers and other professionals have served in a lead role in renovating VA medical centers, developing campus-wide energy efficiency projects, and leading the design…