MEP+S

  • BETA Technologies

    Since BETA’s establishment in 2017, DuBois & King has provided electrical and mechanical engineering for multiple facilities to support the growth and evolving needs of this electric airplane research and manufacturing company. Based at the Burlington International Airport in South Burlington, with manufacturing facilities and a charging network throughout the eastern US, D&K has provided…

  • Cambrian Rise Apartments

    For a newly envisioned lakeside neighborhood on the edge of Lake Champlain, D&K supported the design of new buildings and the renovation of a historic Burlington College building that once housed an orphanage. Including affordable and high-end living spaces, the community-focused neighborhood comprises Buildings A through Q.  D&K’s mechanical, electrical, and plumbing engineers designed systems…

  • South Hall Student Housing

    D&K provided engineering services for a new $17.5M LEED-Gold-certified five-story residence hall that houses up to 283 students, serving as a benchmark for new construction and renovation projects on campus. D&K provided civil/site design, permitting, topographic and boundary surveys, utilities, and cost estimates. Site improvements included grading, stormwater management system, access road/parking, pavement marking/signage, ADA…

  • Middlebury Resource Recovery Center (MRRC)

    PurposeEnergy, a nationwide renewable energy producer, sought to develop an anaerobic digester and food process treatment facility near Middlebury’s wastewater treatment facility (WWTF) in the heart of the town’s industrial district. The project accomplishes two significant goals: reduce loading from food-process waste to the municipal WWTF and maximize the reuse of waste products through a…

  • Legislative Parking Garage

    NHDAS and the NH Legislature relied on a deteriorating parking structure to serve legislative sessions and other government needs. The NH State Government required a new 409-slip garage across the street from the State House on a site then occupied by the NH Department of Justice (DOJ) building. The DOJ was relocated within the City…

  • USFS Supervisor’s Office

    The US Forest Service sought to expand their supervisor’s office and relocate from downtown Rutland to be closer to forest resources in the Green Mountain National Forest. Under successive contracts, D&K worked with the Forest Service, regulators, and other stakeholders to develop site design concepts, survey the area, identify natural resources, secure permitting, and provide…

  • Steam Conversion, 9 State Facilities

    D&K provided mechanical, electrical, structural, landscape architecture, and civil design and retro-commissioning services for modifications of nine state facilities, converting from district steam to various types of local heating systems. D&K designed a new steam boiler plant—located remotely from the buildings it served—for the New Hampshire State House and two other State buildings. The project…

  • Huntington Falls Redevelopment

    Located on the Otter Creek, the Huntington Falls Hydroelectric Project is a historic facility that required redevelopment. The D&K team assessed the two non-operational turbines and related appurtenances, the trash rack, and raker upgrades to the Unit 3 turbine following FERC relicensing. Additional D&K services included design and coordination to upgrade all three turbines, resulting…

  • Georgia Fire Station

    D&K provided design-build renovations on this 9,000-SF fire station. Upgrades included administrative offices, a training room, and a high-bay apparatus area for eight emergency vehicles. Our civil/site team provided permit work and applications, building surveys, grade development, stormwater management, driveway and parking areas, ADA-accessible walkways, and three 14,000-gallon buried water storage tanks for emergency vehicle…