Municipal

  • Fair Haven Park & Ride

    Located in the downtown core, adjacent to the Village Green, the Fair Haven Park and Ride lot consisted of lightly marked spaces with no separation from the roadway on either side. The large contiguous area of paved surface, lack of pedestrian facilities, and minimal striping provided a low level of service. Frequently used by residents…

  • Eval of WWTFs & Pump Stations

    The City of Burlington required a 20-year engineering evaluation of its wastewater treatment plants, collection system, and pump stations; the development of a 10-year capital plan; and consultant services related to wastewater revenue bonds. Satisfying the bond requirements required D&K to provide recommendations regarding (1) operation and maintenance, (2) ways to improve the operation of…

  • Enfield NNIS Management Plan

    The Town of Enfield sought to develop a Non-Native Invasive Species Management Plan to control the non-native, invasive, terrestrial and aquatic plant species in the area. The objectives of the project included the maintenance of ecological integrity in Enfield and public education and outreach across New Hampshire. D&K developed field inventory methods and maps to…

  • Town-wide Wetland Mapping

    The Town of Raymond sought services to map and evaluate wetlands for groundwater protection and water-quality functions. D&K identified 17 priority wetlands and used the 2015 “Method for Inventorying and Evaluating Freshwater Wetlands in New Hampshire” for flood storage, groundwater, and sediment trapping functions. 

  • City Hall Park

    As part of the Great Streets BTV project, D&K assisted with the redesign of City Hall Park. The overall goal of the project was to make Burlington’s downtown core more appealing to users of all modes of transportation and enhance the area’s natural and cultural assets. D&K developed designs for civil, stormwater, and utilities to…