As the result of a fire that partially engulfed a 45-room, wood-framed hotel building, the Bluenose Inn required substantial repairs. D&K supported the owner and the architect by providing fast-tracked survey, site design, permitting assistance, and coordination with municipal officials, as well as mechanical and electrical engineering for 21 suites and parking for 88 vehicles….
The Greg Beaudoin Farm required a new covered barnyard. Under a contract with NRCS, D&K provided A/E services for site investigation, survey and mapping, preliminary and final design, and construction phase services.
Illig Dairy Farm needed to replace an undersized earthen manure pit with a new concrete waste storage facility. D&K advanced the design and engineering, prepared plans and specifications, and observed the construction of a structure with an access ramp and a manure transfer channel.
The Conan Eaton/Auburn Star Farm is located in a significant bendway (oxbow) along the Connecticut River. The preexisting waste storage facility (WSF) was an unlined, open manure pit located on the southern side of the farm within several hundred feet of the river. The existing WSF had inadequate volume to support operations and the number…
Located near Moosehead Lake, 3B1 is served by a 4,000-ft-by-75-ft runway and a 3,001-ft-by-75-ft crosswind runway, hangars, tie-downs, a fuel farm, and a terminal. Since 2017, D&K’s aviation planners and engineers have served as the lead consultant team at the airport. Recent projects have focused on the addition of taxiways, general enhancements to the terminal…
DuBois & King has served as MVM’s planning and engineering consultant since 2020. In this time, our team has worked closely with the airport and the FAA to update the airport’s master plan and provide planning, design, and construction phase services for a new fuel farm and taxiway. The State of Maine identified the Machias…
Located within 25 miles of Boston, the Norwood Memorial Airport is a general aviation airport and a reliever airport for Boston-Logan, with a considerable amount of helicopter traffic. One of the airport’s challenges is that it is situated within an Area of Critical Environmental Concern (ACEC) and within a 100-year flood plain, surrounded by wetlands,…
As the airport engineer at PYM for about 40 years, D&K continues to provide planning, design, and construction phase services for a range of airport projects. Projects have included taxiway and ramp reconstruction, runway extensions, utility improvements, fuel farm improvements, cost estimating, FAA coordination, grant application preparation, lighting addition and conversion, planning, security, and environmental…