Civil+Survey

  • Community Wastewater System

    The Addison Town Hall and Addison Community Baptist Church needed a centralized wastewater system to reestablish use of the historic Town Hall building, which sat vacant for nearly a decade. The structure required significant renovation, and its marginal (mostly clay) soils and a high water table made a conventional on-site wastewater system infeasible. At the…

  • Central Vermont Medical Center

    With 122 beds, the Central Vermont Medical Center serves the 26 communities of Central Vermont and provides a variety of inpatient and outpatient services. For decades, CVMC has entrusted D&K to assist with the support of their projects with civil-site, permitting, traffic engineering, and MEP needs. Our extensive work on the CVMC campus has provided…

  • Gifford Health Care

    For more than 25 years, D&K has served as an integral partner in the development of Gifford Health Care campuses throughout central Vermont. Working collaboratively with Gifford staff, architects, specialty consultants, and stakeholders, our team’s designs have led or supported the construction of new hospital buildings, independent and assisted living communities, medical office buildings, dental,…

  • Cochecho Pump Station Upgrades

    The city completed the design of improvements to the existing wastewater pump station. Through that process, it became evident that the existing system had reached the end of its operating life, and selected components should be replaced rather than upgraded to provide increased reliability, energy efficiency, safety, and compatibility with other city pump stations. D&K…

  • Lagoon Aeration Upgrade

    Orwell’s wastewater treatment facility includes an aerated lagoon facility that provides secondary treatment and chlorine disinfection of wastewater. The facility’s aging lagoon aeration system was a submerged lateral system that had become inadequate and inefficient. D&K provided design, bid, construction management, and startup assistance services to upgrade the lagoon aeration system to meet current standards….

  • Northfield Wastewater Treatment Facility

    The 40-year-old Northfield Wastewater Treatment Facility (WWTF) required a comprehensive upgrade of the facility and process conversion from Trickling Filter (TF) to Sequencing Batch Reactor (SBR) to comply with stringent phosphorous limitations. The site was constrained by the railroad and the Dog River, requiring geotechnical measures to protect rails. D&K conducted all professional engineering services…

  • Statewide Roadway and Traffic Engineering

    To manage the development of ancillary highway and safety projects in scoping, design, and construction phases, the Vermont Agency of Transportation engages on-call consultants to provide engineering evaluation, design, permitting, and appurtenant professional services. D&K provides services under a statewide contract developing projects that enhance traffic control and signing, intersections, slopes, rail crossings, park-and-rides, rest…