Civil+Survey

  • VT 125 Slope Stabilizations

    Swollen by a large storm event, the Middlebury River and local drainages damaged VT 125 in Ripton. The highway was temporarily repaired in the weeks immediately following the storm, but long-term repairs were sorely needed. The project environment consisted of steep roadway embankments immediately adjacent to the Middlebury River. High water velocities and a sinuous…

  • South Ridge Development

    DuBois & King (D&K) provided construction administration and observation services for the installation of new water, sewer, stormwater, phone, cable, and power utilities to serve a new neighborhood within the South Ridge development. Our team reviewed the stormwater collection and treatment systems for compliance with the project permits and state rules.  D&K assisted with Act…

  • Lincoln Levee Repair

    In response to repeated storm damage to this 1,900-ft-long, circa 1960s Army Corps granite block protection levee, the Town of Lincoln needed to repair the levee to maintain an acceptable level of service. DuBois & King evaluated the structural, hydrologic and hydraulic, civil, and structural conditions and requirements of this site along the Pemigewasset River….

  • ARPA Healthy Homes

    Manufactured housing communities in Vermont provide practical housing solutions; however, some of these communities are disproportionately affected by environmental issues. The Vermont Department of Environmental Conservation sought consultants to provide Preliminary Engineering Reports (PERs) and design solutions that responded to the specific challenges faced by MHCs and a backlog of failing wastewater, potable water, and…

  • Manchester Job Corps

    For the construction of the new US Department of Labor (DOL) New Hampshire Job Corps Center, DuBois & King’s survey crew tied into existing boundary corners and collected 1-ft contour intervals on an undeveloped 20-acre wooded parcel. Our surveyors developed the topographic survey into a 3D-model base plan to assist our design team in performing…