Civil+Survey

  • Wise Campus Center

    D&K provided civil/site engineering and construction phase services for site development associated with the construction of a new student center. Services included design for access and parking, including pavement markings and signage, walkways and paths, fencing, drainage, stormwater management, water system, and gravity wastewater system. The stormwater management system was designed with subsurface retention chambers,…

  • West Hall Student Housing

    To expand on-campus housing, NU needed a new 286-bed, five-story, 75,000-SF student housing facility. The project delivery method was unconventional, as the owner acted as the Construction Manager. D&K provided a range of services, including structural engineering. Structural systems consist of precast hollow core planks supported by structural steel beams and columns to facilitate low…

  • Sucker Brook Stream Stabilization

    Sucker Brook was a deeply incised stream channel that threatened nearby infrastructure and sent an estimated one ton of phosphorus per year downstream toward Lake Champlain. The project goals included a reduction of sediment loading and erosion and the restoration of aquatic and riparian habitat while minimizing construction and maintenance costs. D&K prepared conceptual and…

  • Union Village Dam Removal

    The New Hampshire Department of Environmental Services identified the 1861 concrete and masonry Union Village Dam as high-hazard and deficient in a number of areas. The owners’ preferred option was to remove the dam to reduce potential hazards and remove a hydraulic and aquatic organism passage barrier from the river, restoring the river to a…