Civil+Survey

  • West Hall Student Housing

    To expand on-campus housing, NU needed a new 286-bed, five-story, 75,000-SF student housing facility. The project delivery method was unconventional, as the owner acted as the Construction Manager. D&K provided a range of services, including structural engineering. Structural systems consist of precast hollow core planks supported by structural steel beams and columns to facilitate low…

  • Sucker Brook Stream Stabilization

    Sucker Brook was a deeply incised stream channel that threatened nearby infrastructure and sent an estimated one ton of phosphorus per year downstream toward Lake Champlain. The project goals included a reduction of sediment loading and erosion and the restoration of aquatic and riparian habitat while minimizing construction and maintenance costs. D&K prepared conceptual and…

  • Union Village Dam Removal

    The New Hampshire Department of Environmental Services identified the 1861 concrete and masonry Union Village Dam as high-hazard and deficient in a number of areas. The owners’ preferred option was to remove the dam to reduce potential hazards and remove a hydraulic and aquatic organism passage barrier from the river, restoring the river to a…