Planning

  • EV Fueling Infrastructure Plan

    The Vermont Agency of Transportation wished to establish public electric-vehicle charging infrastructure on VTrans-owned property. Working for the Policy, Planning, and Intermodal Development Division of VTrans, D&K teamed up with the Vermont Energy Investment Corporation to author a plan to provide the necessary tools for an EV charging-station network. The project team evaluated VTrans properties for…

  • Smugglers’ Notch Parking

    Near Mt. Mansfield, Vermont’s highest peak, a 1.5-mile section of VT 108 traverses a mountain pass at 2,165 ft and provides trailhead access for the Long Trail, local crags, and other day-use areas. Increased use of the area led to on-street and off-street informal parking that, in turn, led to environmental, drainage, and safety issues….

  • FERC Part 12D, Eastman Falls

    To maintain operation under its FERC-issued license, the owner was required to furnish a Part 12D Inspection Report to FERC. Serving as the Part 12D independent consultant, D&K’s engineering team reviewed and analyzed performance and design data and conducted a visual inspection of the water retaining portion of the facility, including both abutments, both powerhouses,…

  • Gooseneck Bend Slope

    Along Otter Creek, a 160-ft-long, 20-ft-high slide occurred on the Gooseneck Bend Road embankment, disrupting the roadway’s stability. The Town of Weybridge secured FEMA funding and engaged D&K to evaluate the failure and design long-term improvements that armored the embankment along the roadway using stone armoring and plantings, stabilizing the immediately adjacent gravel road.